REQUEST FOR PROPOSAL
N°2008063
Construction of a mini stand-alone water supply system in The Jacob Town Rehab Community, Montserrado County and Weala, Margibi County, Liberia
| Issuing Organization | Catholic Relief Services Liberia |
| Donor | CRS Private Fund |
| Project | Advancing Quality Access Through Resilient Infrastructure, Systems, and Engagement (AQUARISE) Project |
| Budget Code | 103066 |
| Issue Date | March 2, 2026 |
| Site Visit | March 10 & 11, 2026 |
| Pre-Bid Meeting | March 13, 2026 |
| Request for Clarification Deadline | March 17, 2026, at 4:00 pm GMT |
| Submission Deadline | March 26, 2026, at 4:00 pm GMT |
| Contact Email | liberiarfq@crs.org |
| Type of Agreement | Fixed Term Contract Agreement |
March 2026
Table of Contents
Section I. General Information. 4
Section II. Instructions to Bidders (ITB) 5
Section III. Eligibility and Minimum Qualification Requirements (MQR) 11
Section IV. Evaluation Criteria. 18
Section V. Post-Qualification Actions 23
Section X. Bill of Quantities 66
Section XI. Construction Contract Template. 6
CRS, through its internal resources, has been implementing WASH activities in Liberia since 2022. The overarching goal of the project is to transform water service delivery and urban agriculture in Montserrado and Margibi counties by piloting an integrated digital governance model and climate-smart irrigation system. Leveraging CRS’ proven HELPS II water infrastructure, this investment will:
Catholic Relief Services (CRS) hereby invites qualified and experienced construction firms to submit proposals for the construction of two (2) Water Supply Systems, one in Jacob Town Rehab and one in Weala, Margibi County, as detailed in the drawings provided in Section IX. This intervention is funded by CRS internal resources and aims to significantly improve access to basic water services for the Jacob Town Rehab community and Weala community, serving more than 12,000 residents in Monsterrado and Margibi Counties. The construction will include:
Given the critical importance of this project, timely execution is essential. Construction is anticipated to commence in April 2026 and be completed by September 2026.
Location/Site #1: Jacob Town Rehab Community, Monsterrado County.
Location/Site #2: Weala, Margibi County.
Type of work: Construction of two Mini Stand-alone Water Supply Systems
Site visit #1: Jacob Town Rehab, One (1) group visit will be organized on March 10, 2026, at 10:00 am GMT. All interested Bidders should be at the Jacob Town Petro Trade Gas Station at 10:00 am GMT.
Site visit #2: Weala Margibi County, One (1) group visit will be organized on March 11, 2026, at 10:00 am GMT. All interested Bidders should be at the Mount Barclay Police Checkpoint at 10:00 am GMT.
A Pre-Bid Meeting will be held both in person (for company based in Liberia) and online (for international bidders only) on March 13, 2026 at 9:00 am to 12:00 pm GMT at Corina Hotel (24th Street Sinkor). All interested bidders are encouraged to attend.
To receive the meeting link, international bidders MUST register their interest by emailing liberiarfq@crs.org no later than 2 days before the pre-bid meeting. Attending the pre-bid meeting is highly recommended. Bidder MUST review the RFP prior to the pre-bid meeting.
All interested bidders MUST register their intent to participate in this procurement process by submitting the following information to liberiarfq@crs.org no later than March 25, 2026, at 4:00 pm GMT:
Send an email to liberiarfq@crs.org with the subject line: “Registration for RFP No. 2008063”. Attach or include the information (from b. Registration Requirement) in the body of the email.
Bidders are advised that all specific financial, time, and liability obligations are defined in the Particular Conditions (PC). The bid price MUST reflect the full cost of meeting these binding contractual requirements.
Local Bidders must submit their proposals in three (3) separate sealed envelopes, enclosed in an outer sealed envelope (where each envelope must be marked with bidder’s name and contact information) clearly labeled with the RFP reference number and subject line:
To ensure proper evaluation, International Bidders must submit three separate ZIP files corresponding to:
Note: Attachment should not be more than 20 megabytes (20 MB). Alternatively, bidders may provide a secure link to an online location (e.g., cloud storage or file-sharing platform) where their application documents can be accessed and downloaded, ensuring the link remains active and accessible to the evaluation committee throughout the evaluation period.
Local Bidders MUST submit three (3) hard copies of their proposals for each envelope in sealed envelope to:
Catholic Relief Services – Liberia Program
16th Street Gardiner Avenue
Seaside, C-140 Building, Sinkor
Monrovia, Liberia
International Bidders may submit their proposals electronically via email to liberiaprocurement@crs.org with the following subject line: RFP No. 2008063.
International Bidders may also submit hard copies via courier (by following Local Bidders format in sub-section (f)), but CRS will not be responsible for delays in delivery.
NOTE: Bidders MAY choose to submit a proposal for ONLY one water supply system or BOTH systems; they MUST meet all the requirements as outlined in the RFP.
The evaluation of proposals will follow a three-stage, sequential process based on the contents of the three (3) sealed envelopes/Zip files:
Stage (1): Eligibility & Minimum Qualification Requirements (MQR) (Envelope No. 1 or ZIP File 1) (PASS/FAIL)
The Evaluation Committee will first open and review Envelope No. 1 (Local Bidders) or the ZIP File 1 (International Bidders) to assess compliance with mandatory PASS/FAIL criteria. This stage is a prerequisite for opening Envelope No. 2/ Zip File 2.
Stage (2): Technical Evaluation (Envelope No. 2 or ZIP File 2):
Bidders who pass the MQR stage will have their Technical Proposals scored against the criteria outlined in subclause 40. Technical Evaluation.
Stage (3): Financial Evaluation (Envelope No. 3 or ZIP File 3):
Financial Proposals will be opened and evaluated only for bidders who meet the minimum technical score. This stage includes a fiduciary risk check before scoring.
See subclause 39. Financial Evaluation for more details.
The project is Good Services Tax (GST)-exempt under the agreement with the Government of Liberia; hence, all prices and unit rates in the Bill of Quantities (BoQ) MUST be submitted exclusive of GST. The estimation of the items in this BOQ MUST include costs of material, transportation, manpower/labor, machinery, installation, and profit. No other costs will be included beyond this BOQ.
To assist in the examination, evaluation, and comparison of quotes, CRS may, at its discretion, ask the Bidder for clarification of its bid. The request for clarification and the response shall be in writing, and no change in price or substance of the quote shall be sought, offered, or permitted.
CRS may, for any reason, whether at its own initiative or in response to a clarification requested by a prospective Bidder, amend the Request for Proposals. To afford prospective /Bidders reasonable time in which to take the amendments into account in preparing their offers, CRS may, at its discretion, extend the deadline for the submission of bids.
Any addenda will be transmitted only to Bidders who have officially registered their intent to bid (b. Registration Requirement). CRS will also ensure that any Bidder who registers the submission deadline is immediately provided with all previously issued addenda and clarifications.
All questions or requests for clarification must be submitted in writing to: liberiarfq@crs.org. Deadline for clarification requests: March 17, 2026, at 4:00 pm GMT. CRS will respond to the clarifications within 3 working days after the deadline.
CRS reserves the right to modify any part of this Request for Proposal including the deadline for submission of bids, either at its own initiative or because of requests for clarification or otherwise from one or several prospective bidders.
Bidders may modify or withdraw by means of a modification to the bid already submitted or by a notice of withdrawal, respectively. Modifications or notices of withdrawal shall be addressed in the same way as bids and must reach CRS. In case of a modification, the bidder should submit a full new proposal following the same procedures.
In the event of a tie in final scores (Technical Score + Financial Score), CRS will apply the following criteria to determine the winning bidder:
The financial proposal is used to determine which proposals represent the best value and serves as a basis of negotiation before award of a contract. The financial proposal will include all costs associated with implementation of the technical proposal, including profit, and other fees.
Supporting information must be provided in sufficient detail to allow for a complete analysis of each financial element or line item. CRS reserves the right to request additional financial information if the evaluation committee has concerns of the reasonableness, realism, or completeness of a Bidder’s proposed cost.
Under no circumstances MAY FINANCIAL PROPOSAL INFORMATION BE INCLUDED IN ENVELOP 1 AND ENVELOP 2. Financial quotation must only be shown in the Financial Proposal.
Best offer proposals are requested. It is anticipated that a contract will be awarded based on the original offers received. However, CRS reserves the right to request clarifications and conduct a negotiation with the entire bid committee in attendance, prior to award. At the sole discretion of CRS, Bidders may be requested to conduct oral presentations. If deemed an opportunity, CRS reserves the right to make separate awards per component or to make no award at all.
A Contract will be executed with the Bidder whose proposal is determined to be responsive to this solicitation document, meets the eligibility criteria stated in this RFP, meets the technical, management/personnel, and corporate capability requirements, and is determined to represent the best Value for Money (VfM) to CRS. Best Value for Money will be decided using a weighted scoring process. Upon being notified, the awarded bidder will confirm acceptance by submitting a Letter of Acceptance. (Annex 3).
This RFP does not obligate CRS to execute a contract, nor does it commit CRS to pay any costs incurred in the preparation and submission of the proposals. Furthermore, CRS reserves the right to reject any and all offers, if such action is considered to be in the best interest of CRS.
CRS may reject any bid that is not substantively responsive to the terms and conditions of the RFP.
A Bid shall be considered materially deficient and non-responsive if the omission of information prevents the Evaluation Committee from verifying the Bidder’s compliance with any mandatory Minimum Qualification Requirement (MQR), including but not limited to:
Any Bid deemed materially deficient shall be rejected and disqualified.
CRS reserves the right to seek clarification for minor clerical omissions (missing phone number or stamp, minor formatting issues) that do not affect the substance of the MQR or the Bid Price. Such clarification requests will not be used to solicit missing mandatory documentation.
For the purposes of financial (Financial Capabilities, Average Annual Construction Turnover) and experience criteria (Specific Construction Experience), substantially meet means fulfilling the quantitative requirement by at least 95% (95/100). Failure to meet any numerical threshold by more than 5% shall be deemed a material failure and result in disqualification.
An Applicant may be conditionally qualified (for the next stage), that is, qualified subject to the Applicant submitting or correcting certain specified non-material documents or deficiencies to the satisfaction of CRS. Conditionally prequalified applies to an Applicant who has substantially met all criteria but has a minor, non-material deficiency (e.g., a missing stamp on mandatory forms).
Note: Eligibility criteria (e.g sanctions, conflicts of interest, bid security etc.) must be strictly met and cannot be substantially met.
CRS reserves the right, at its sole discretion, to amend, modify, or withdraw this Request for Proposal (RFP), in whole or in part, at any time prior to the deadline for submission of proposals. Any such changes will be issued as formal written amendments and communicated to all prospective bidders who have received the RFP. CRS will distribute amendments via liberiarfq@crs.org. Bidders are responsible for ensuring they have received all amendments prior to submission. CRS shall not be liable for any costs incurred by respondents as a result of such amendment, modification, or withdrawal.
CRS reserves the right to verify the authenticity of any document or information submitted at any stage of the procurement process. If any document is found to be forged, altered, or misleading, whether intentionally or due to negligence, the following actions will be taken:
CRS maintains a zero-tolerance policy for fraud, misrepresentation, and unethical conduct in its procurement processes.
All information submitted by bidders will be treated as confidential and used solely for the purpose of evaluating proposals and administering the procurement process. CRS will not disclose any information relating to the evaluation of proposals or recommendations concerning contract award to any person not officially involved in the process.
CRS will process all personal data submitted in accordance with its applicable internal privacy policy. Personal data will be used solely for the purposes of this procurement and will not be shared with third parties except as required by law or donor policy.
Upon written request, unsuccessful bidders may receive a debriefing outlining the strengths and weaknesses of their proposal. Requests must be submitted to the email address; liberiarfq@crs.org within 5 days of notification of award.
Any complaints regarding the procurement process must be submitted in writing to CRS through liberiaprocurement@crs.org within 7 days of the event giving rise to the complaint. CRS will acknowledge receipt and respond.
The Contractor must provide full cooperation for all compliance reviews and audit by CRS/CRS Private Fund.
To ensure fair competition and the selection of technically and financially capable vendors, CRS has established the following eligibility criteria. Bidders must demonstrate compliance through valid documentation.
CRS reserves the right to request any Bidder to clarify its bid or to provide missing historical information that does not change the substance of the bid. The Organization may, at its sole discretion, allow a Bidder to rectify a non-material omission within a stipulated timeframe. (See subclause 15. Material Errors and Clarification)
The Bidder shall furnish, as part of its Bid, a Tender Security (or Bid Security Guarantee) in the amount of US$ 10,000.00 (Ten Thousand United States Dollars). This is a mandatory eligibility requirement, and failure to submit the Tender Security in the required form and amount shall result in the immediate rejection of the Bid.
The Tender Security shall remain valid for a period of thirty-five (35) days beyond the expiry of the Bid Validity Period (90 days).
The Tender Security may be forfeited if a Bidder:
(a) Withdraws its Bid during the Bid Validity Period (90 days).
(b) Does not accept the correction of arithmetical errors, as specified in clause 44. Financial Evaluation subclause n. Correction of Arithmetic Errors.
(c) Fails to sign the Contract Agreement or fails to furnish the required Performance Security after having been notified of the acceptance of its Bid.
The ten percent (20% of the contract price) Advance Payment is conditional upon submitting a valid Advance Payment Guarantee and satisfying all other requirements detailed in PC – Part B, Sub-Clause 14.2.
The cost of insurance with specific minimum coverage limits MUST be priced by the Bidder and is fully specified in PC– Part B, Sub-Clause 19.2.
In accordance with the tax laws of the Republic of Liberia, CRS shall withhold applicable taxes from all payments made under this contract. The current withholding tax rate is:
The withheld amount shall be remitted directly to the Liberia Revenue Authority (LRA), and evidence of tax paid shall be issued to the Contractor upon request.
It is the responsibility of the Contractor to ensure compliance with all applicable tax obligations in Liberia. CRS shall not be liable for any tax liabilities arising from the Contractor’s failure to comply with national tax laws.
Tax will be applied to the following:
Bidder understand and acknowledge that the purchase and import of any goods or services using funds provided under this Agreement must be exempt from the relevant taxation applicable in the Host Country, including, but not limited to:
(1) Customs duties, import duties, taxes or fiscal charges of equal effect levied or otherwise imposed on the goods or services imported into the Host Country under this Agreement, and
(2) The value-added tax levied or otherwise imposed on the purcashes of goods and services using funds provided under this Agreement.
The Contractor represents to CRS that the goods and services procured under this Agreement are not subject to any such taxes and that any such taxes will not be included in any invoice submitted by the Contractor to CRS. In the event that any such taxes are paid, CRS has the right to obtain a refund from the Contractor of any such tax payment.
The Contractor is responsible for securing and maintaining all required permits and registrations (e.g Labor Ministry for foreign staff) as detailed in PC – Part B, Sub-Clause 1.13.
The Bidder shall be subject to automatic disqualification and rejection of its Bid at the Minimum Qualification Requirements (MQR) stage if any of the following facts are disclosed in the Bidder’s submission (including Forms CON-2 and Forms CON-3) or discovered by the Employer during due diligence:
Note: Past non-performance or ES incidents will be evaluated based on their severity and relevance to the current contract’s risks. The key determinant for qualification is the Bidder’s integrity (full disclosure) and its current capacity to manage and resolve such issues. Only breaches related to integrity, contract termination for default, or CRS Private Fund zero-tolerance policies (child protection, sexual exploitation and abuse etc) will result in disqualification.
Bidders are required to meet the following criteria to be eligible to participate in this procurement:
| Eligibility and Minimum Qualification Criteria | Documentation | ||||
| No. | Subject | Requirement | Type of requirement | Submission Requirements | |
| 1. Eligibility | |||||
| 1.1 | Application Form (Acknowledge, stamp and sign) | Must meet requirement | Application Submission Form | ||
| 1.2 (a) | Nationality and Legal Capacity | Nationality Legal right to conduct business from home countries | Must meet requirement | (1) Business Registration or Equivalent AND (2) Valid Tax Clearance Certificate or equivalent | |
| 1.2 (b) | Nationality and Legal Capacity | Proof that no bankruptcy proceedings are pending against the Bidder | Must meet requirement | (1) A court clearance or confirmation that no bankruptcy proceedings are pending against the individual OR (2) Entity current audited financial statements. | |
| 1.3 | Absence of Conflict of Interest | No Conflicts of interest
Assessment Method Cross-reference the Applicant’s name and its affiliates against project’s record for consulting services provided (e.g design, supervision) | Must meet requirement | Form CoI – 1.3 | |
| 1.4 | Articles of Incorporation or equivalent | Must Meet requirement | Articles of Incorporation or equivalent | ||
| 1.5 | Legal/Technical Capability (Bidders) | (i) Hold Ministry of Public Works construction certification (Category B1 to B12).
(ii) Association of Liberian Construction Contractors (ALCC) certificate.
(iii) Public Procurement and Concessions Commission (PPCC) certificate. | Must Meet requirement Must Meet requirement
Must Meet requirement | Legal documents, certifications, licenses and permits | |
| 1.6 | Licenses, Permits, and Certification from the home country for water system constructions (International Bidders) | Must Meet requirement | |||
| 1.7 | Physical presence of Registered Liberian Entity (Local Bidders)
Proof of physical presence from home countries (International Bidders) | Proof of physical presence in Liberia (Local Bidders)
Proof of physical presence from home countries (International Bidders) | Must meet requirement | (Lease or Rental agreement or Land Deed)
| |
| 1.8 | Bid Security Guarantee | Must meet requirement | Annex 1 | ||
| 2. Experience | |||||
| 2.1 | Historic of Non-Performing Contracts | Non-performance of a contract [1] did not occur as a result of contractor’s default since 1st January 2020.
Assessment Method Checks for any contract termination due to the Applicant’s fault (poor quality, breach of contract) within the specified period | Must Meet requirement[2] | Form CON-2 with court clearance | |
| 2.2 | Environmental and Social (ES) past performance declaration | Declare any civil work contracts that have been suspended or terminated and/or performance security called by an organization for reasons related to the non-compliance of any environmental or social (including Sexual Exploitation and Abuse) contractual obligations in the past five (5) years[3]. | Must make the declaration.
| Form CON-3 ES Performance Declaration | |
| 3.1 | Financial Capabilities | (i) The Applicant shall demonstrate that it has access to, or has available, liquid assets, lines of credit, and other financial means sufficient to meet the construction cash flow requirements estimated as US$ 50,000 (fifty thousand USD) for the subject contract(s) net of the Applicants other commitments (ii) The audited financial statement for the last three (3) years shall be submitted and must demonstrate the current soundness of the Applicant’s financial position and indicate its prospective long-term profitability.
Applicants can substantially meet this criterion | Must meet requirement
Must meet requirement
| Form FIN – 3.1
(The audited financial statement for the last three (3) years | |
| 3.2 | Total Annual Construction Turnover | Minimum Total Annual Construction Turnover within the last five (5) years of US$ 500,000 (Five hundred thousand USD), calculated as total certified payments received for contracts in progress or completed, as evidenced by the Total Revenue/Turnover lines in the submitted Audited Financial Statements.
Applicants can substantially meet this criterion | Must meet requirement
| Form FIN – 3.2
| |
| 4.2 (a) | Specific Construction Experience | Participation as Contractor, Management Contractor or Subcontractor, or Joint Venture in AT LEAST three (3) contracts implemented for a register company, INGO, Government or register local organization. within the last five (5) years, each with a minimum value of US$ 100,000 (One hundred thousand USD). These contracts MUST have been Successfully or Substantially Completed (80% and above) and be similar in nature to the proposed works.
One of the three contracts MUST be a mini stand-alone water supply system construction project, this MUST algin within the minimum contract value as stated above
The other two contracts MUST be any construction-related contracts.
Similarity shall be defined as the construction of stand-alone water supply systems. | Must meet requirement | Form EXP – 4.2 (a) with attachments (3 contracts within the last 5 years)
| |
| 5.1 | Sectoral Clearance | WASH Sectoral Clearence from the National WASH Commission of Liberia (Local Bidders)
Certificate/permit from home country to implement WASH activities. (International Bidders) | Must meet requirement | Valid WASH Sectoral Clearance Certificate. | |
To ensure compliance and facilitate a fair evaluation process, bidders must submit the following administrative documents. These documents will be reviewed on a PASS/FAIL basis. Failure to submit any of the mandatory items, or submission of non-compliant versions, will result in automatic disqualification.
Examples of non-compliance include (but are not limited to): Expired business or tax clearance, falsified documents, inconsistencies in submitted information, forged diplomas or documents with illegible.
Bidders MUST submit three (3) copies of the eligibility and administrative documents. Envelop No.1 should be structured as a single, comprehensive document that addresses all criteria listed as per Sub-clause 36. Mandatory Eligibility & Minimum Qualification Requirements.
Note: Bidder can find a complete checklist in Annex 9. Mandatory Eligibility & Minimum Qualification Requirements Checklist.
All Eligibility and MQR documents MUST be submitted as per instruction in subclause 3. Format of Submission.
All technically compliant proposals will be evaluated using a weighted scoring system. The maximum technical score is 70 points. Only bidders who score at least 49 points will qualify for Financial Evaluation.
| Criteria | Maximum points | Scoring Mechanism | |||||||||||||||
| Tech01 Past Experience: Demonstrate experience in successfully executing works that are substantially similar in nature, size, value, and complexity similar to the scope of this contract (e.g in constructing water supply systems, and storey/high-rise structures. | 15 | Eligibility: 5 Points are awarded for the three contracts submitted in Eligibility.
5 Points will be awarded for additional contract up to two (2) . The contracts must meet subfactor 4.2 (a): contract with a minimum value of US$ 100,000, that has been successfully or substantially completed, and that are similar to the proposed works.
One of the two additional contracts MUST be a water supply system construction contract. Contracts MUST have been implemented for a Register Company, INGO, Government or Register Local organization.
Compliant Evidence to validate an experience Contract along with the following (issued by the Client/Employer): a) A copy of the contracts, a signed Certificate of Substantial Completion or Final Acceptance Certificate OR b) A copy of the Final Interim Payment Certificate (IPC) or a letter from the client stating the Total Certified Value paid/due on that project.
Score allocation Three (3) Contracts provided during Eligibility stage: 5 points 1 additional contract: 5 points 2 additional contracts: 10 points (one must be a water supply system construction contract) | |||||||||||||||
| Tech02 Technical Methodology Each section will be evaluated based on clarity, relevance, feasibility, and alignment with project scope of work. | 20 | Annex 4 contains full detailed scoring. | |||||||||||||||
| Tech03 Key Personnel assigned to the mission (Annex 6) – CVs inclusive of professional experience, education (BSc Degree minimum), and language skills must be provided for staff to be engaged. This scores the qualification.
Project Manager proposed to have a bachelor’s degree with a minimum of five years of construction works of similar scale or larger.
Project Engineer proposed to have a bachelor’s degree with a minimum of five years of experience, supervised a minimum of three projects of similar scale or larger.
Community Engagement Officer proposed to have a bachelor’s degree with a minimum of three years of experience, supervised a minimum of three projects of similar scale or larger.
Environmental Health and Safety Officer proposed to have a bachelor’s degree with a minimum of three years of experience in conducting environmental health and social impact assessments. Experience of working on similar construction projects, managing environmental health and safety activities. | 16 |
| |||||||||||||||
| Tech04 Pre-Construction (Mobilization & Timeline) A timeline or schedule for Mobilization Plan Detail, Key Milestones and Critical Path and Contract Duration Feasibility. | 10 | Annex 7 contains full detailed scoring. | |||||||||||||||
| Tech05 Environmental Health and Safety | 9 | Annex 8 contains full detailed scoring. | |||||||||||||||
| Total possible score | 70 |
The Evaluation Committee (EC) will assess proposals using two distinct scoring protocols:
These criteria will be scored based on verification process against the defined thresholds (number of additional contracts and key personnel with minimum years of experience).
The final score will be determined by consensus among the Evaluation Committee and recorded directly on the final scoring sheet.
The final score for these sections will be determined by the Arithmetic Average of the individual scores provided by the Committee Members. To ensure transparency, the EC will calculate the variance for every section. If the variance between the highest and lowest individual score equals or exceeds twenty five percent (25%) of the maximum points, the EC will be mandated to hold a review and documentation meeting. The purpose of this meeting is to document the reason for the significant technical disagreement, which will be included in the evaluation report for audit purposes.
Three (3) copies of the Technical Proposal must be submitted. It should be structured as a single, comprehensive document that addresses all criteria listed in the Technical Evaluation table:
All technical documents must be submitted as per instruction in subclause 3. Format of Submission.
The Financial Proposal will be evaluated after the Technical Proposal has passed the minimum acceptable score 49 points and will be subjected to the following three (3) sequential checks. A bid may be rejected at any point in the process.
Total financial score is 30 points allocated using:
PF = 30 * Co/C, with
CRS reserves the right to accept or reject any bid, and to cancel the bidding process and reject all bids, at any time prior to the award of contract, without thereby incurring any liability to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of the grounds for such action.
The contract will be awarded to the bidder with the highest combined score, calculated based on the weighted technical score and the weighted financial score. The evaluation committee will consider both technical and financial criteria to determine the bidder that offers the best overall value for money, ensuring the required technical specifications are met while achieving cost-effectiveness.
The final score for each bidder will be the sum of the technical score and financial score, with a maximum of 100 points.
The purpose of this check is to identify Bids that are so low they raise material concerns about the bidder’s ability to perform the contract without compromising quality and safety. This check will be applied sequentially, starting with Bidder with the highest final score.
The URA checks shall be performed concurrently with the ALO check on financial proposal of the bidder with the highest combined score. URA is performed to prevent front-loading and non-responsive pricing on specific items, even if the total price is reasonable.
For bid identified as an ALO or having Unbalanced Unit Rates, CRS, in consultation with the Engineer and CRS Regional Office shall decide whether to accept or reject the Bid. The Bid will be rejected if the Bidder’s explanation and evidence are not satisfactory for the low price and confirm that the Bidder can execute the Contract for the offered price without detriment to quality or ESHS standards.
If the top ranked bidder financial proposal fails the ALO or URA, the Committee shall proceed to review the next top ranked bidder by applying the same ALO and URA checks, continuing until a financially sustainable bid is confirmed.
For the purpose of bid comparison and evaluation, all foreign currencies will be converted to United States Dollars (USD) using the OANDA Interbank Mid-Rate published on the day of the Bid Submission Deadline.
Bidders must submit three (3) copies of the Financial Proposal, which should include the following components:
All financial documents must be submitted as per instruction in subclause 3. Format of Submission.
Following the evaluation of bids, CRS will undertake a post-qualification process to verify the accuracy and authenticity of the information and documentation submitted by the bidder. This process may include, but is not limited to:
The bid committee may seek clarifications from bidders after the technical and financial evaluations. The request for clarifications shall be in writing and sent to the authorized representative of the bidder by the CRS procurement person involved with the bid. The request shall provide the bidder with adequate time to respond, depending on the nature of the questions. Bidders shall be given a timeframe to submit clarifications to CRS. All requests for clarification shall be issued and responded to in writing, and no change in the price or substance of the bid shall be sought, offered, or permitted, except as required, in order to allow for correction of arithmetic errors discovered by CRS.
This scope of work is to be undertaken by the selected construction contractor. It includes the construction and handover of a Mini Stand-alone Water Supply System. The construction activities described in this Scope of Work shall be governed by the signed Contract Agreement comprised of the FIDIC Red Book (Second Edition 2017, Reprinted 2022), including General Conditions, Particular Conditions, Technical Specifications, Drawings, and all Addenda. All referenced documents form an integral part of the Contract and shall be read together.
Details of the scope of work include, but are not limited to, the following activities:
1.1 Site Clearance
This includes removing bushes and trees to allow access and undisturbed construction work.
The Contractor shall prepare the site or other areas indicated on the drawings, bill of quantities, or as instructed by the CRS Program Manager or partner supervisors, by carrying out a general clearance of the ground and by removing trees to permit the proper execution of the works.
Stumps and major roots shall be grubbed out and all combustible material arising shall be gathered into windrows and burnt. The Contractor shall take precautions to prevent the spread of fire to adjacent land/property.
1.2 Excavation
1.2.1 Ground Levels and Measurement of Excavation
After having completed the removal of the topsoil and before commencing any other excavation or refilling, the Contractor shall take levels at frequent intervals and agree upon them with the CRS Program Manager or Partner Supervisor. The depth of excavations shall be taken as the depth from the ground surface to the levels designated on the drawings or bill of quantities, except that if the Supervisor’s Representative instructs additional excavation below the required formation level, the extra depth shall be added to the direct measurement.
Where measurements are based on volumes, whether for excavation in an open trench, back-filling excavations with concrete or other approved material, or for any other purpose, the dimensions of excavation shall, for the purpose of measurement and payment, be taken as the elevation dimensions except otherwise specified. The Contractor should in his rate make available some allowance for working space.
1.2.2 Excavation – General
Excavation shall be carried out in such a manner and in such climatic conditions as to avoid damage to or deterioration of suitable material that is designated for incorporation in the works. Where excavation reveals a combination of suitable and unsuitable materials the Contractor shall, wherever the Supervisor’s Representative considers it practicable, carry out the excavation in such a manner that the suitable material is excavated separately for use in the works without contamination by the unsuitable material.
Suitable material that is rendered unsuitable by the operations of the Contractor due to non-compliance with the specification shall be run to spoil and replaced by an equal quantity of excavation from the works. The excavation shall proceed with such portions at one time as the Supervisor’s Representative may direct. All excavated material shall be deposited so that it will cause no damage or inconvenience to the public.
1.2.3 Excavation for the Installation of the Pipeline
The width of any trench for pipe work of whatever diameter shall be the minimum required for the installation of the pipe and for the installation of temporary supports, should they be necessary. The dimension of the trench shall be as shown on the Laying Instructions in the relevant contract drawing and bill of quantities but shall generally be not less than 24 inches from ground level to the bottom of the pipe for a single pipe in a trench. For a trench with more than one pipe, the diameters of the pipes should be added to the prescribed width for excavation. After laying the pipe, the space between the adjacent pipes and pipe and excavation walls shall not be less than 200mm. The Supervisor’s Representative shall approve the width and depth of the trench per the bill of quantities. The Contractor SHALL provide appropriate caution tapes to ward off any intruders from the trenches and prevent any accidents occurring once the trenches have been excavated and not yet laid. No trench SHALL be left unattended overnight.
1.3 Materials for Concrete
1.3.1 Aggregates
Aggregates shall be hard, clean, and free of all organic material. They should conform to the appropriate national standards. Samples of all aggregates to be used SHALL be brought to the Employer’s Representative for approval before use.
Coarse aggregates SHALL be comprised of well-graded material between 6mm and 15mm in size. Sand used for concrete SHALL consist of hard material of size not less than 4mm and shall contain no more than 5% silt. Sand used for cement mortar shall be fine-grained and if required shall be screened through a 3mm sieve.
1.3.2 Cement
Cement SHALL be normal Portland cement delivered in 50kg bags. The bags shall be in perfect condition when delivered to the site and SHALL be not more than 3 months old at the time of use. All broken bags or bags showing evidence of dampness or caking SHALL be immediately removed from the site. Reuse of spilled cement is not permitted.
1.3.3 Steel reinforcement
Plain mild steel bars with dimensions specified in the bill of quantities SHALL be used for the reinforced beam and slabs and other purposes. The Contractor SHALL remove any loose rust from the bars by brushing with a steel brush.
1.3.4 Water
The Contractor SHALL provide all water needed on the site. Water used for mixing concrete SHALL be clean and of a quality suitable for drinking.
1.3.5 Concreting
Concrete mixes
The following concrete mixes are specified:
| Use | Mix ratio | Coarse aggregate size |
| In-situ footing and floor (Plain) | 1:3:6 | < 38mm |
| In-situ beam (R.C) | 1:2:4 | < 19mm |
| Precast slabs (R.C) | 1:2:4 | < 19mm |
1.3.6 Curing
All concrete works, including beams and slabs, SHALL be protected from rapid drying for 14 days by covering them with white polythene sheets and watered daily.
1.3.7 Formwork
Slab formwork SHALL have a maximum deviation from straightness of 5mm over the full length of the slab. All formwork inner surfaces should be planed smooth as all concretes shall be cast to finish.
1.3.8 Mixing, placing, and compaction
Casting of concrete slabs and mixing of concrete SHALL be carried out adjacent to where it is needed, and hand mixing SHALL be carried out on a wooden or metal sheet or cement platform. Concrete SHALL be mixed in the correct proportions as directed by the Technical Supervising Officer. All concrete surfaces shall be finished immediately upon placing (Cast to finish all surfaces)
1.3.9 Cement mortar
Cement mortar for all block laying (all works shall however be concrete except for the walls of the pump head station) shall be made by mixing 4-part sand with 1-part cement by volume. Cement mortar shall be mixed on a clean surface such as a cement platform or wooden or metal sheet. Mortar shall be mixed in small quantities and used within 1 hour. Mortar that has already hardened shall not be knocked up and remixed for use.
1.4 Fencing and Protective Area
1.4.1 Dwarf Wall:
Footing depth to the dwarf walls shall not be less than 250mm and shall have a concrete depth of not less than 150mm. The height of the dwarf wall (mass concrete) at the front and side views of all fencing areas shall not be more than mm from the walkway floor. Finishing to these walls shall be cast to finish and painted with 3 coats of oil-based paint. The color is to be determined by the CRS Technical Supervising Officer.
1.4.2 Galvanized Iron (GI) Poles:
Galvanize Iron pipes of ‘dog leg’ shape and diameter 50mm (2 inches) shall be used as support poles for the fencing and 50mm (2 inches) as corner posts.
The galvanized poles shall be not less than 1750mm high above walkway floor level and at least 600mm below ground level or as directed by the CRS Senior Project Officer and specified in the BoQ.
The base of the steel pipes shall have a be a reinforced concrete column to receive 50mm steel pipes (Total Length > = 2500mm long).
The galvanized steel pipes shall be primed or painted with anti-rust. All unprimed metalwork to be painted shall be cleaned down by wire brushing and scraping to remove all loose scale, dirt, and grease, and shall be primed immediately afterward.
Metalwork which has been primed before delivery shall be inspected for errors by the CRS Senior Project Officer. Unsatisfactory priming shall further be cleaned, wire brushed, and primed or rejected for replacement. The number and distances between galvanized pipes shall be as detailed in the design drawings and as directed by the CRS technical person.
Aluminum barbed wires shall be fixed on dog leg GI poles as protection to prevent intrusion into all fenced areas. The length of barbed wires shall be as specified in BoQ or enough to provide the necessary protection.
1.4.3 Chain link fence
1.4.4 Metal Gates
Metal gates, the overall size of opening space; 36’’ x 82’’ high; with 2 inches galvanized pipe as stiles, top, bottom, and bracing rails; cover one side with 3mm diameter expanded galvanized iron square mesh as shown in drawing shall be installed at all fenced areas. Single or double gates will be installed in each area as specified in the BoQ. Doors shall be painted with one coat of red oxide undercoat and two finishing coats of gloss oil paint and protected with one brass high-security padlock.
1.4.5 Yard graveling
Granitic hard stone chippings of size ranging from 12mm to 20mm shall be used for graveling to cover the entire space of the fenced areas up to a thickness not less than 75mm from the level graded ground. Also, a damp-proof membrane (DPM) or Polythene Plastic sheeting shall be provided for spreading over all the yard areas to prevent the growth of grasses within the yards.
1.5 Elevated Tank and Stand
1.5.1 Concrete Work for the Tank Stand
The concrete works for the elevated tower will be per the provisions under section 1.3.5 and as specified in the drawings or as determined by the CRS Senior Project Officer.
1.5.2 Storage Tank
A total of 12No. 3.8m3 or 3,785-liter per Polytank shall be installed with water level indicator as storage on the second and third levels of the concrete stand at 20ft first level and 30ft 2nd level high above ground level. Tanks shall be equipped and fitted with galvanized pipes for supply, distribution main, washout or drain, and overflow as shown on the drawings and specified in BoQs. All water-retaining structures shall be subjected to a water-tightness test after completion.
On completion of the water tightness test, the Contractor shall thoroughly clean the interior of the tanks by hosing down the roof, walls columns, baffle walls, and floor, as applicable, with, clean, potable water from an approved source and remove all debris, soil, silt or other material.
The Contractor shall then, when instructed by the CRS Senior Project Officer disinfect the tanks by chlorination (including the provision of the chlorine), which shall be capable of injecting the required concentration of chlorine at a steady rate into the tanks.
1.6 UPVC Pipes
uPVC pipes shall comply with global standards. Pipes less than 50 mm in diameter can be glue-jointed, but joints of larger diameters shall be mechanical and of the POWER LOCK type.
Jointing of pipes shall be carried out in strict compliance with the manufacturer’s instructions. Glue joints shall be made only with the glue recommended by the pipe manufacturer. The glue that has passed its expiry date SHALL not be used under any circumstances.
To simplify maintenance works in the future, pipe sizes are restricted to those below or as specified in BoQ. Pipes used should be generally available on the market, 2’’ PVC pipes.
| Internal diameter (mm) | Pressure (PN 10) | Pressure (PN 16) |
| Wall thickness (mm) | ||
| HDPE 32 | 1.80 | 2.40 |
| HDPE 40 | 1.90 | 3.00 |
| HDPE 50 | 2.40 | 3.70 |
| HDPE 63 | 3.00 | 4.30 |
1.7 Pipelaying
1.7.1 Handling and Storing of Pipes.
When handling, transporting and laying pipes and accessories, care must be taken to prevent cracks and other damage to the pipes and the accessories. Special care shall be taken to keep the coating and lining of the pipes intact. PVC pipes, rubber gaskets, glue, etc., shall always be stored under cover and in the shade. In storage, pipes shall be arranged in such a manner that the pressure of pipes placed on each other will not cause cracking or deformation or damage to the pipe and/or the coating. The interior and the machined ends of the pipes SHALL be kept free from dirt and foreign matter, always. Pipes shall not be moved by dragging or rolling them on the ground but shall be lifted and placed carefully.
1.7.2 Laying of Pipes
Pipes shall be laid to a minimum cover of 2ft under roads and footpaths and to a minimum cover of 2ft below ground level elsewhere.
The pipes shall be laid to the lines and levels shown on the drawings. Each pipe shall be separately laid upon an even foundation of 100 mm sand bedding prepared as shown in the drawings and to be free from stones and any other projections. If the characteristic of the excavated material is found to be close to that of sand (grain size, uniformity, absence of hard bodies likely to damage pipe), the Project CRS Senior Project Officer may approve the use of this material to be used wholly for the backfilling.
Before pipes are jointed, they shall be thoroughly cleaned of all earth lumps, stones, or any other objects that may have entered the interior of the pipes.
When pipe laying is not in progress, the open ends of installed pipes shall be closed by approved means. The plugs shall be imperforated and shaped to close the pipe bore completely so water from the trench excavation shall not gain access into the pipeline.
Where curves of a long radius are required, these shall be obtained by deflection at the joints; such deflections, however, shall not exceed either vertically or horizontally the limits given in the relevant contract drawings.
1.7.3 Cutting of Pipes
No cutting shall be made on any kind of pipe with chisel and hammer. Where cutting is necessary it shall be done with an approved turning machine or approved cutting saw or knife. The cut and turned ends of pipes shall be neatly trimmed and burrs and sharp edges shall be removed.
1.7.4 Testing of Pipelines
The pressure test is to allow the Contractor to identify points of leakage and cracks in the laid pipe to be rectified. The Contractor shall notify the CRS Senior Project Officer 24 hours before a test is conducted.
The tests shall be carried out in sections of a length proposed by the Contractor but not exceeding 100m joints whichever is less. The test shall be carried out as soon as possible after laying of the section. Each section to be tested shall have been backfilled except the joints, which shall be left open for inspection. The Contractor may also backfill the joints but has to bear in mind that he will have to re-excavate them at his own cost if the section does not pass the test. All thrust blocks on each line to be tested must have been cast at least 72 hours before testing.
All valves shall be operated and examined, and a special check shall be made on the air valves for proper functioning. The Contractor shall take care to properly close all valves on each section to be tested. Chambers, if completed shall be checked for proper finish and easy access.
Procedure to be followed for pipe testing:
For the test, the Contractor shall supply the following equipment:
If a test fails, the Contractor shall locate and repair the leakage(s) and then repeat the test following the first procedure, all at his own expense. The test on each section shall be repeated until the specified degree of water tightness has been obtained.
An allowance shall be made for a static head between the lowest point and the point of measurement if both are not on the same level. The Contractor shall establish a report of the test in an approved format.
The cost of preparing lines for testing and execution of tests including the supply of all necessary test equipment, supply of water for scouring, filling, and testing the line, and any work done in connection thereof shall be deemed to be included in the Contractor’s rates for pipework, laying and jointing.
1.7.5 Sterilization of Pipelines
All pipelines that have passed the pressure test as laid out, shall be flushed out until the wash water runs clear. Sterilization of pipelines shall be effected by introducing a chlorine solution (the chlorine solution shall be derived from a 1% solution of calcium hypochlorite in water or chlorinated lime, also called ”bleaching powder” or liquid sodium hypochlorite known as ”liquid laundry bleach”), in a concentration of 25 mg per liter into the pipeline so that a residual-chlorine of not less than 10 mg per liter remains in the water after 24 hours standing in the pipes during which time, all intermediate valves shall be operated at least once.
1.7.6 Pipeline Markers
Pipeline indicators in class B concrete and according to the approved drawing of the Contractor shall be supplied and installed by the Contractor 1000 mm from the center of the pipeline at 100 m intervals, and at all junctions, locations of valves, washouts, road crossings, and all characteristics points on the mains. The pipe markers shall be placed as far as possible from roads along which pipes have been laid. The pipe marker shall be engraved with the symbol of the item by which it is placed and shall also show the direction of the pipeline. The indicator posts shall be set up in holes dug into the ground and backfilled with tamped earth, and where in rocky ground, shall be concreted.
1.7.7 Household Connection
The Contractor shall ensure that 50 households are connected to the water supply system. The Contractor is responsible for the installation and connection of UPVC pipes, including all necessary plumbing fittings and accessories, to the designated homes.
The project participants are responsible for the procurement of water meters.
1.8 Electro-Mechanical Installations
The main electro-mechanical installations involve mechanization of the borehole(s) using submersible pumps including all the necessary control panels and associated fittings, powered by a 2-phase power generator. The water to be abstracted is generally non-aggressive and therefore not subject to corrosion. Before the installation of pumps, however, the Contractor is required to test the quality of the water to confirm its suitability for the pump units.
1.8.1 Construction of Boreholes
The scope of work covers all activities required to develop a functional groundwater source for the mini stand‑alone water supply system. Key tasks include:
Site Assessment and Mobilization
Borehole Drilling
Casing and Screen Installation
Borehole Development
Pumping Test
Water Quality Testing
Pump Installation
Headworks Construction
Commissioning and Handover
1.8.2 Submersible Pump
All pumps shall have the following characteristics:
Pump Selection
Protections for Pumping Equipment
The system must be equipped with the following protections:
COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT PLAN
Safety, Security, and Environmental Management
General
Specific Environmental Issues to be Considered.
Worksite/camp Site Waste Management
Material Excavation
Material Deposit
Rehabilitation and soil erosion prevention
Water resources management
Traffic management
Blasting
Disposal of Relocated Elements
Health and Safety
Repair of Private Property
Wherever the Contractor, whether deliberately or incidentally damages private property it has to be repaired. For each repair the Contractor has to obtain from the owner the certificate, that the damage has been made good satisfactorily in order to indemnify the Client from subsequent claims.
Final Deliverables
The works specified in the scope of work shall be completed within 210 calendar days from the time the Commencement Date. However, the bidder has the right to propose a realistic construction schedule based on their workplan and methodology. If the bidder’s proposed duration to complete the scope of work is over the estimated period provided by CRS, a negotiation between CRS and the winning bidder to find a middle ground will be conducted prior to the signing of Contract. The detailed construction schedule shall be part of the construction contract once agreed to with CRS.
The design drawings, specifications and bill of quantities are shown in the given link. Design drawings for …. are contained in s, blank Bill of Quantities are shown in excel file and the Specification in pdf file.
Date: [Insert day, month, year]
RFP No. and title: 2008063 – Water Supply Systems Construction
To: CRS Liberia
We, the undersigned, declare that:
Signed [insert signature(s) of an authorized representative(s) of the Applicant and signed by the authorized representative of each company forming any Joint Venture]
Name [insert full name of person signing the Application]
In the capacity of [insert capacity of person signing the Application]
Duly authorized to sign the application for and on behalf of:
Applicant’s Name: [insert full name of Applicant or the name of the JV
Address: [Insert full address: street number, city/town, country]
Date: [Insert day] of [Insert month], [Insert year]
Form CoI – 1.3
Declaration of Absence of Conflict of Interest
Print on the candidate’s letterhead if possible
Date:
Catholic Relief Services (CRS) Liberia Office
| I, the undersigned, Mr. or Mrs.: | __________________________________________________ | |
| Acting as: _________________________________________________________ | ||
| Company Authorized Representative: (Company Name, Address) _________________________________ | ||
| _____________________________________________________________________________ | ||
Declares that:
Finally, I authorize CRS to verify this information. I also agree to assume the consequences of any breach of this Agreement in connection with the performance of this Agreement.
Company Name: ______________________
Name of In-Charge: ____________________
Position: _____________________________
Signature: ____________________________
Date: _______________________________
Form CON – 2
Historical Contract Non-Performance, Pending Litigation and Litigation History
[The following table shall be filled in for the Applicant]
Applicant’s Name: [insert full name]
Date: [insert day, month, year]
RFP No. and title: 2008063 – MINI STAND-ALONE WATER SUPPLY SYSTEMS Construction
Page [insert page number] of [insert total number] pages
| Non-Performing Contracts in accordance with Section III, Eligibility Requirements | |||
| Contract non-performance did not occur since 1st January 2020 in accordance with Section III, Eligibility Requirements, subfactor 2.1
Contract(s) not performed since 1st January 2020 in accordance with Section III, Eligibility Requirements, subfactor 2.1 | |||
| Year | Non performed portion of contract | Contract Identification Total | Total Contract Amount (current value, US$ equivalent) |
| [insert year] | [insert amount and percentage] | Contract Identification: [indicate complete contract name/ number, and any other identification] Name of Employer: [insert full name] Address of Employer: [insert street/city/country] Reason(s) for non performance: [indicate main reason(s)] | [insert amount] |
| Pending Litigation | |||
| No pending litigation Pending litigation as indicated below. | |||
| Year of dispute | Amount in dispute (currency) | Contract Identification
| Total Contract Amount (current value, US$ equivalent) |
| [insert year] | [insert amount] | Contract Identification: [indicate complete contract name, number, and any other identification] Name of CRS: [insert full name] Address of CRS: [insert street/city/country] Matter in dispute: [indicate main issues in dispute] Party who initiated the dispute: [indicate “CRS” or “Contractor”] Status of dispute: | [insert amount] |
| Litigation History | |||
| No Litigation History Litigation History as indicated below. | |||
| Year of award | Outcome as percentage of Net Worth | Contract Identification | Total Contract Amount (currency), USD Equivalent (exchange rate) |
| [insert year] | [insert percentage] | Contract Identification: [indicate complete contract name, number, and any other identification] Name of CRS: [insert full name] Address of CRS: [insert street/city/country] Matter in dispute: [indicate main issues in dispute] Party who initiated the dispute: [indicate “CRS” or “Contractor”] Reason(s) for Litigation and award decision [indicate main reason(s)] | [insert amount] |
*The Bidder shall use the OANDA Interbank Mid-Rate published on the last day of the fiscal year.
Company Name: ______________________
Name of In-Charge: ____________________
Position: _____________________________
Signature: ____________________________
Date: _______________________________
Form CON – 3
ES Performance Declaration
[The following table shall be filled in for the Applicant]
Applicant’s Name: [insert full name]
Date: [insert day, month, year]
RFP No. and title: 2008063 – MINI STAND-ALONE WATER SUPPLY SYSTEMS Construction
Page [insert page number] of [insert total number] pages
| Environmental and Social Performance Declaration in accordance with Section III, Eligibility Requirements | |||
| No suspension or termination of contract: Employer has not suspended or terminated a contract and/or called the performance security for a contract for reasons related to Environmental, or Social (ES) performance since the last 5 years. Declaration of suspension or termination of contract: The following contract(s) has/have been suspended or terminated and/or Performance Security called by Employer(s) for reasons related to Environmental or Social (ES) performance since the last 5 years. Details are described below: | |||
| Year | Suspended or terminated portion of contract | Contract Identification | Total Contract Amount (current value, currency, exchange rate and US$ equivalent) |
| [insert year] | [insert amount and percentage] | Contract Identification: [indicate complete contract name/ number, and any other identification] Name of Employer: [insert full name] Address of CRS: [insert street/city/country] Reason(s) for suspension or termination: [indicate main reason(s) e.g. gender-based violence; sexual exploitation or sexual abuse breaches] | [insert amount] |
| [insert year] | [insert amount and percentage] | Contract Identification: [indicate complete contract name/ number, and any other identification] Name of Employer: [insert full name] Address of Employer: [insert street/city/country] Reason(s) for suspension or termination: [indicate main reason(s) e.g. gender-based violence; sexual exploitation or sexual abuse breaches] | [insert amount] |
| [list all applicable contracts] | |||
| Performance Security called by an Employer(s) for reasons related to ES performance | |||
| Year | Contract Identification | Total Contract Amount (current value, currency, exchange rate and US$ equivalent) | |
| [insert year] | Contract Identification: [indicate complete contract name/ number, and any other identification] Name of Employer: [insert full name] Address of Employer: [insert street/city/country] Reason(s) for calling of performance security: [indicate main reason(s) e.g. gender-based violence; sexual exploitation or sexual abuse breaches] | [insert amount] | |
The Bidder shall use the OANDA Interbank Mid-Rate published on the last day of the fiscal year.
Company Name: ______________________
Name of In-Charge: ____________________
Position: _____________________________
Signature: ____________________________
Date: _______________________________
Form FIN – 3.1
Bank Certificate to confirm Financial Situation and Performance
[This certificate MUST be issued by the primary bank either on behalf of a joint venture or a single applicant]
Minimum content of the Bank Certificate
Important Note: The bank certificate SHOULD NOT list the specific account number nor the current balance.
Form FIN – 3.2
Total Annual Construction Turnover
[The following table shall be filled in for the Applicant AND for each member of a Joint
Venture]
Applicant’s Name: [insert full name]
Date: [insert day, month, year]
RFP No. and title: 2008063 – MINI STAND-ALONE WATER SUPPLY SYSTEMS Construction
Page [insert page number] of [insert total number] pages
| Annual Turnover (Audited Revenue) Data (construction only) | |||
| Year | Amount Currency | Exchange rate* | US$ equivalent |
| [indicate year] | [insert amount and indicate currency should be payment received for work completed or ongoing and not contract value] | [insert amount in US$ equiv.] | |
| Average Annual Construction Turnover ** | |||
* The Bidder shall use the OANDA Interbank Mid-Rate published on the last day of the fiscal year being reported for each of the five years submitted.
* Average Annual Construction Turnover calculated as total Certified Payments received for work in progress or completed, divided by the number of years (5)
Eligibility Requirements subfactor 3.2
Calculation: Total Revenue (Year 1) + Total Revenue (Year 2) + Total Revenue (Year 3) + Total Revenue (Year 4) + Total Revenue (Year 5) total.
Verification: None needed beyond the Audited financial statements.
Company Name: ______________________
Name of In-Charge: ____________________
Position: _____________________________
Signature: ____________________________
Date: _______________________________
Form EXP – 4.2 (a)
Specific Construction and Contract Management Experience
[The following table shall be filled in for contracts performed by the Applicant]
Applicant’s Name: [insert full name]
Date: [insert day, month, year]
RFP No. and title: 2008063 – Mini Stand-alone Water Supply Systems Construction
Page [insert page number] of [insert total number] pages
List chronologically works performed as Prime Contractor of a nature and amount similar to the work proposed in this bid over the past five years. Also list details of work in progress or committed to, including the expected completion date(s), using the table below.
| Similar Contract No. [insert number] of [insert number of similar contracts required] | Information | ||||
| Contract Identification | [insert contract name and number, if applicable] | ||||
| Award date | [insert day, month, year, as in 15 June, 2015] | ||||
| Completion date | [insert day, month, year, as in 03 October, 2017] | ||||
| Role in Contract [check the appropriate box] | Contractor Management | Contractor | Subcontractor | Member in JV | |
| Total Contract Amount | US$ [insert total contract amount in US$ equivalent] | ||||
| If member in a JV or subcontractor, specify participation in total Contract amount | [insert a percentage amount] | [insert total contract amount in local currency] | [insert exchange rate and total contract amount in US$ equivalent]* | ||
| Employer’s Name: | [insert full name] | ||||
| Address: | [indicate street / number / town or city / country] | ||||
| Telephone/fax number | [insert telephone/fax numbers, including country and city area codes] | ||||
| E-mail: | [insert e-mail address, if available] | ||||
| Description of the similarity in accordance with scope of work in accordance with subfactor 4.2 (a) | [insert contract name and number, if applicable] | ||||
| 1. Amount | [insert amount in US$ in words and in Figures] | ||||
| 2. Physical size | [insert physical size of activities] | ||||
| 3. Complexity | [insert description of complexity] | ||||
| 4. Methods/Technology | [insert specific aspects of the methods/technology involved in the contract] | ||||
| 5. Other Characteristics | [insert other characteristics if any] | ||||
*The Bidder shall use the OANDA Interbank Mid-Rate published on the last day of the fiscal year.
Note: In order to verify if the contracts have been successfully or substantially completed, each contract should be accompanied by:
1) A copy of signed Certificate of Substantial Completion or Final Acceptance Certificate of the Client/Employer OR
2) A copy of the Final Interim Payment Certificate (IPC) or a letter from the client stating the Total Certified Value paid/due on that project.
This form will be verified against the information of the Audited Financial Statement for the last five years.
The total certified payments claimed for any given fiscal year will be cross-checked against the Total Construction Turnover in the Audited Financial Statement. To account for standard retentions and accounting timing differences, the reported revenue in the financial statement MUST represent at least 80% of the total certified values claimed for that period.
In case of discrepancy (between certified payments and the audited financial statement) exceeding 20%, CRS reserves the right to seek clarification. Failure to provide a satisfactory reconciliation within the stipulated timeframe shall result in the rejection of the affected project experience. If the rejection brings the total number of qualifying projects below the mandatory five (5), the entire bid will be deemed non-responsive.
Company Name: ______________________
Name of In-Charge: ____________________
Position: _____________________________
Signature: ____________________________
Date: _______________________________
Guarantee No.: [ insert guarantee reference number ]
The Guarantor: [ insert name and address of place of issue, unless indicated in the letterhead ]
Name of Contract/Contract No.: [ insert reference number or other information identifying the contract with regard to which the tender is submitted]
The Beneficiary (the “Employer”): CRS Liberia [ insert name and address of the Beneficiary ]
We have been informed that [ insert name and address of the Tenderer ] (hereinafter called the “Applicant”) is submitting an offer for such Contract in response to your invitation, and that the conditions of your invitation (the “Conditions of Invitation”, which are set out in a document entitled Instructions to Tenderers) require his/her offer to be supported by a tender security.
At the request of the Applicant, we [ insert name of Guarantor ] hereby irrevocably undertake to pay you, the Beneficiary/Employer, any sum or sums not exceeding in total the amount of US$ 10,000.00 (Ten Thousand United States Dollars and Zero Cents) upon receipt by us of your demand in writing and your written statement (in the demand) that:
Any demand for payment must contain your signature(s) which must be authenticated by your bankers or by a notary public. The authenticated demand and statement must be received by us at the following office [ insert address of office ] on or before [ insert the date 35 days after the expiry of the validity of the Letter of Tender ], when this guarantee shall expire.
The party liable for the payment of any charges: The Applicant
[ insert the name of the party ].
This guarantee shall be governed by the laws of the Republic of Liberia [ insert the law
governing the guarantee ], and shall be subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758.
SIGNED by: SIGNED by(1):
(signature) (signature)
(name) (name)
Date:
(1) Whether one or more signatories for the bank are required will depend on the bank and/or applicable law.
NAME OF CONTRACT:
TO:
We have examined the Conditions of Contract, Specification, Drawings, Schedules including the Bill of Quantities, the Contract Data and Addenda Nos for the above-named Contract and the words and expressions used herein shall have the meanings assigned to them in the Conditions of Contract. We offer to execute and complete the Works and remedy any defects therein, in conformity with this Tender which includes all these documents, for the sum of
[ currency and amount in figures ]
[ currency and amount in words ]
or such other amount as may be determined in accordance with the Contract.
We agree to abide by this Tender until [ date ] and it shall remain binding upon us and may be accepted at any time before that date.
If this offer is accepted, we will provide the specified Performance Security, commence the Works as soon as is reasonably practicable after the Commencement Date, and complete the Works in accordance with the above-named documents within the Time for Completion.
Unless and until a Contract Agreement is prepared and executed this Letter of Tender, together with your written acceptance thereof, shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest or any tender you may receive. Signature in the capacity of
duly authorized to sign tenders for and on behalf of
Address:
Date:
NAME OF CONTRACT:
CONTRACT NUMBER:
TO:
Date:
Your Reference:
Our Reference:
We thank you for your Tender dated for the execution and completion of the Works comprising the above-named Contract and remedying of defects therein, all in conformity with the terms and conditions contained in the Contract.
We have pleasure in accepting your Tender for the Accepted Contract Amount of:
[ currency and amount in figures ]
[ currency and amount in words ]
which amount includes the Provisional Sums (if any).
In consideration of you properly and truly performing the Contract, we agree to pay you the Accepted Contract Amount or such other sums to which you may become entitled under the terms of the Contract, at such times and as prescribed by the Contract.
We acknowledge that this Letter of Acceptance creates a binding Contract between us, and we undertake to fulfil all our obligations and duties in accordance with the terms of this Contract.
Signed by: (signature) For and behalf of:
Date:
| Section No. | Max Points | Excellent (100% – Full Compliance + Innovation) | Good (75% – Full Compliance) | Fair (50% – Partial Compliance) | Poor (0 Points – Missing/Non-Compliant) |
| I. Project Comprehension (4 Pts) | |||||
| 1. Summary of Approach | 1 | 1 Pt: Max 1 page. Identifies the 3 highest cost/risk items in the BoQ/Drawings and provides a specific mitigation statement for each. | 0.75 Pt: Max 1 page. Identifies the 3 highest risk items, but mitigation is generic. | 0.5 Pt: Summary is present but only paraphrases the RFP’s project scope. | Missing, irrelevant, or exceeding 1-page limit. |
| 2. Understanding of Context and Challenges | 1 | 1 Pt: Identifies 3 or more unique, site-specific constraints that were not explicitly listed in the RFP. | 0.75 Pt: Identifies and discusses all major constraints listed in the RFP documents. | 0.5 Pt: Discusses only generic construction risks without site-specific analysis. | Section is missing, or analysis is copied boilerplate. |
| 3. Review of Design & Constructability | 1 | 1 Pt: Proposes a clear process and identifies at least one (1) specific, high-impact coordination conflict between trades (e.g., MEP vs. Structure) with a proactive resolution strategy. | 0.75 Pt: Proposes a general internal design review process with clear steps and responsibilities. | 0.5 Pt: General commitment to reviewing design without detailing a specific process or responsibility matrix. | Missing or fails to mention design coordination. |
| 4. Value Engineering Proposal | 1 | 1 Pt: Includes a process and one specific, quantifiable proposal for value engineering that demonstrably reduces cost or time without compromising quality. | 0.75 Pt: Includes a clear process for internal and external Value Engineering submissions and review. | 0.5 Pt: General statement of intent to perform Value Engineering without process or example. | Missing, or proposal would violate a mandatory requirement. |
| II. Core Execution Plan (13 Pts) | |||||
| 5. Technical Approach: Soundness of Methodology | 2 | 2 Pts: The methodology is structured, detailed all major phases and linked directly to the schedule/Gantt chart. | 1.5 Pts: The methodology is logical and complete but structured around major phases only. | 1 Pt: The methodology is presented but lacks detail or is not fully aligned with the project scope. | Missing, or is unusable/irrelevant to the project. |
| 6. Detailed Activity Schedule | 2 | 2 Pts: Provides a clear, detailed activity schedule using a Gantt Chart, including activity sequencing, the start date, and completion date of each activity, and logically links them to the 5. Technical Approach. | 1.5 Provides a clear, detailed activity schedule using a Gantt Chart, including activity sequencing, no start date, and completion date of each activity, and it not logically links them to the 5. Technical Approach. | 1 Pt: Provides a generic work schedule or simply paraphrases the BoQ/drawings without describing the activities and sequencing. | Missing, or proposes a non-feasible method. |
| 7. Quality Assurance/Control (QA/QC) Plan | 2 | 2 Pts: Includes an Inspection and Test Plan (ITP) with specific hold points and sign-off responsibilities for 3 critical structural or specialized elements (e.g., concrete, steal, blocks, specialized flooring). | 1.5 Pts: Provides a detailed QA/QC manual that generally outlines procedures for material testing and workmanship checks. | 1 Pt: General commitment to quality checks without detailing specific ITP steps or sign-off hierarchy. | Missing, or is purely a restatement of the project specifications. |
| 8. Materials Procurement Plan | 1 | 1 Pt: Includes a detailed, sequenced list of all long-lead time items with clear, confirmed sourcing, and required delivery dates. | 0.75 Pt: Lists major materials and components but does not specifically detail the long-lead time items or their lead times. | 0.5 Pt: Mentions procurement in general terms without detailing the process or specific material sourcing. | Missing, or proposes materials that are non-compliant with the specifications. |
| 9. Manpower Schedule | 2 | 2 Pts: Provides a detailed weekly/monthly schedule showing required staffing levels for 20 or more persons and demonstrates the plan for sourcing and mobilizing specialized trades for MINI STAND-ALONE WATER SUPPLY SYSTEM. | 1.5 Pts: Provides a schedule with a total manpower counts but lacks detail on specialized roles or mobilization timing. | 1 Pt: Provide a simple chart with only total crew numbers without detailing roles, specialties, or schedule. | Missing, or the proposed staffing is insufficient for the project timeline and complexity. |
| 10. Equipment Management Plan | 2 | 2 Pts: Mandatory Annex Form used (Annex 5). Minimum list of essential equipment (1 dump truck of 14 cubic meters, 1 compactor of 1,200 LB minimum, 1 concrete mixer of 8 cubic meter minimum, 1 vibrator 20 m³/h minimum) + Specialized construction tools, a detailed dated utilization schedule linked to the (6). Detailed Activity Schedule. | 1.5 Pts: Mandatory Annex Form used (Annex 5). Minimum list of essential equipment (1 dump truck of 14 cubic meters, 1 compactor of 1,200 LB minimum, 1 concrete mixer of 8 cubic meter minimum, 1 vibrator 20 m³/h minimum) and a detailed Utilization Schedule showing mobilization/demobilization dates for all major plant. | 1 Pt: Mandatory Annex Form used (Annex 5) Minimum list of essential equipment (1 dump truck of 14 cubic meters, 1 compactor of 1,200 LB minimum, 1 concrete mixer of 8 cubic meter minimum, 1 vibrator 20 m³/h minimum) but the utilization schedule is generic, undated, or lacks detail on key plant usage periods. | Mandatory Annex Form is not used, OR the required Minimum list of essential equipment is missing from the submission. |
| 11. Site Organization and Layout Schedule | 1 | 2 Pts: Provides a scaled Site Layout schedule clearly showing all temporary work (offices, storage, labor camp, fence), access points, and designated safety areas. | 1.5 Pts: Provides a schedule with missing details. | 1 Pt: Provided a general written description of the site layout without an actual schedule. | Missing, or the plan violates site boundary restrictions. |
| 12. Risk Management Plan | 1 | 2 Pts: Identifies at least 3 high-impact projects risks and details mitigation measures with assigned responsibilities and timeline | 1.5 Pts: Identifies 3 risks but provides only generic mitigation strategies. | 1 Pt: Provides a list of general construction risks without specific mitigation actions. | Missing, or fails to list any risk. |
| III. Interface and Control (3 Pts) | |||||
| 12. Progress Monitoring | 1 | 2 Pts: Proposes a detailed, structured Monitoring Plan. | 1.5 Pts: Proposes a monitoring plan with clear details of “how the monitoring will be done”. | 1 Pt: Proposes a monitoring plan without clear details of “how the monitoring will be done”. | Missing, or monitoring plan method is clearly inadequate for the project complexity. |
| 13. Project Closeout and Handover Plan | 2 | 2 Pts: Detailed plan covering the sequencing of final functional testing, compilation of Operation & Maintenance (O&M) manuals, and a structured, multi-session training program for the Community-Based Enterprise (CBE) | 1.5 Pts: Provides a general list of closeout requirements (testing, manuals, training) without a clear sequence or structure. | 1 Pt: General statement that O&M manuals and training will be provided upon completion. | Missing, or only addresses the physical construction completion, ignoring handover requirements. |
| TOTAL | 20 Pts | ||||
In the case of a Joint Venture, either of partner or member company must provide duly completed information.
| Description (Type, Model, Make) | No. of | Year of Manufacture | 1) Ownership 2) Valid Rental OR Lease agreement 3) Purchase Agreement | Capacity | Motor No./Body No | Condition | Present Location | |
| 1 | Dump Truck | 1 | 14 cubic meters minimum | |||||
| 2 | Compactor | 1 | 1200 LB minimum | |||||
| 3 | Concrete mixer | 1 | 8 cubic meters minimum | |||||
| 4 | Vibrator | 1 | 20 m3/h minimum | |||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 |
Required Supporting Document:
Company Name: ______________________
Name of In-Charge: ____________________
Position: _____________________________
Signature: ____________________________
Date: _______________________________
Give the detailed information of the key personnel who are scheduled to be assigned as full-time field staff for the project. Fill up a form for each key personnel.
– Authorized Managing Officer / Representative
– Sustained Technical Employee
Name and Address of Client Length of Service
_____ year(s) from _____ to ______
Supporting Documents for each key personnel
(1) Copy of degree (bachelor or master)
(2) CV
Note: For key personnel to be validated, Bidder MUST fill out this Annex AND provide (1) and (2). This is a PASS/FAIL to have the point.
Company Name: ______________________
Name of Key Personne: ____________________
Role in the Proposal: _____________________________
Signature of Key Personnel: ____________________________
Date: _______________________________
Tech04
| Section No. | Max Points | Excellent (100% – Full Compliance + Innovation) | Good (75% – Full Compliance) | Fair (50% – Partial Compliance) | Poor (0 Points – Missing/Non-Compliant) |
| 1. Mobilization Plan Detail | 5 | 5.0 Pts: Provides a detailed Pre-Construction Timeline (Gantt Chart) covering the first 30 days. This timeline should be fully integrated with TechCR02, Section 9 (Manpower) and Tech02, Section 10 (Equipment), and is supported by a written narrative. | 3.75 Pts: Provides a detailed Pre-Construction Timeline (Gantt Chart) covering the first 30 days, listing all major activities, but lacks full integration with the Manpower/Equipment schedules. | 2.5 Pts: Provides a written narrative of the first 30 days of work with key milestones, but no accompanying Gantt chart or visual schedule. | Missing, or timeline is generic and does not align with the Contract Start Date. |
| 2. Key Milestones & Critical Path | 3 | 3.0 Pts: Identifies the Critical Path activities for the entire project, links the main project phases directly to Tech02, Section 5 (Technical Approach), and clearly marks the target completion dates for 3 major MINI STAND-ALONE WATER SUPPLY SYSTEMS milestones. | 2.25 Pts: Provides a comprehensive Gantt chart for the full contract duration, but the Critical Path is not clearly identified or justified. | 1.5 Pts: Provides a high-level bar chart or simple list of milestones without showing task dependencies or a clear completion date for all major phases. | Submission only lists the final contract completion date without any interim milestones. |
| 3. Contract Duration Feasibility | 2 | 2.0 Pts: The proposed contract duration is demonstrably less than the maximum period allowed in the RFP and the methodology (Tech02) justifies the accelerated schedule. | 1.5 Pts: The proposed duration is exactly the maximum period allowed and is fully justified by the activity sequencing. | 1.0 Pt: The duration meets the requirement, but the sequencing logic (Tech02, Section 6) shows a high risk of delay or lacks float for key activities. | The proposed duration exceeds the maximum allowed time in the RFP. |
| TOTAL | 10 Pts |
| Section No. | Max Points | Excellent (100% – Adaptive and Proactive) | Good (75% – Compliant and Detailed) | Fair (50% – Basic Compliance and General) | Poor (0 Points – Non-Compliant/Missing) |
| 1. Occupational Health & Safety (OHS) | 3 | 3.0 Pts: Provides a Site-Specific Safety Plan detailing procedures for 3 High-Risk Construction Activities with a clear emergency response flowchart for each. | 2.25 Pts: Provides a comprehensive Safety Manual detailing standard safety procedures, but no clear hierarchy of safety personnel and responsibilities. | 1.5 Pts: Provides a general commitment to safety and lists mandatory personal protective equipment (PPE) but lacks site-specific procedures or detailed risk assessment. | Missing, or relies solely on a boilerplate corporate policy without site adaptation. |
| 2. Environmental Management (EMP) | 3 | 3.0 Pts: Details a specific, measurable plan for managing MINI STAND-ALONE WATER SUPPLY SYSTEMS-specific waste management that includes segregation, authorized disposal sites, and monitoring procedures. | 2.25 Pts: Provides a detailed plan for managing standard construction waste and addresses dust/noise mitigation. | 1.5 Pts: Provides a general commitment to environmental compliance and promises to manage waste but lacks specific methods or disposal site confirmation. | Missing, or proposes a method that violates environmental regulations. |
| 3. Social/Safeguarding Plan (Inclusion & Risk) | 3 | 3.0 Pts: Submission includes a comprehensive Social/Safeguarding Policy Framework that fully details the mandatory Code of Conduct for all personnel, outlines the procedure for the Grievance Redress Mechanism (GRM), and describes the methodology for managing community interfaces. | 2.25 Pts: Includes a Code of Conduct and a basic plan for managing community complaints or grievances (Grievance Redress Mechanism, GRM). | 1.5 Pts: General commitment to hiring and avoidance of social harm but lacks a formal Code of Conduct or a defined GRM for the community. | Missing, or plan shows no awareness of CRS Private Fund social safeguarding requirements (e.g., GBV, child labor). |
| TOTAL | 9 Pts |
| # | Required Document | Applicable to | Evaluation Stage |
| 1 | Application Submission Form Acknowledge, stamp and sign | All Bidders | Eligibility & Contractual Compliance |
| 2 | Business Registration Certificate OR equivalent AND Valid Tax Clearance Certificate OR equivalent | All Bidders | Eligibility & Contractual Compliance |
| 3 | (1) A court clearance or confirmation that no bankruptcy proceedings are pending against the individual OR (2) Entity current financial audited statements. | All Bidders | Eligibility & Contractual Compliance |
| 4 | Declaration of Absence of Conflict of Interest Acknowledge, stamp and sign (Form CoI – 1.3) | All Bidders | Eligibility & Contractual Compliance |
| 5 | Articles of Incorporation OR equivalent | All Bidders | Eligibility & Contractual Compliance |
| 6 | Ministry of Public Works Construction Company Certificate, category (B.1 – B.12) | Local Registered Liberian Bidders | Eligibility & Contractual Compliance |
| 7 | Association of Liberian Construction Contractors (ALCC) Certificate | Local Registered Liberian Bidders | Eligibility & Contractual Compliance |
| 8 | PPPCC Certificate of Registration | Local Registered Liberian Bidders | Eligibility & Contractual Compliance |
| 9 | Licenses, Permits, and Certification from the host country water systems constructions. | International Bidders | Eligibility & Contractual Compliance |
| 10 | Demonstrate implementation capacity via formal partnership (Memorandum of Understanding or Joint Venture Agreement) with a Registered Liberian Entity. The MoU/JV Agreement should describe the role of the partner in the venture. | All Bidders | Eligibility & Contractual Compliance |
| 11 | Physical presence of Registered Liberian Entity (Lease or Rental agreement or Land Deed) | All Bidders | Eligibility & Contractual Compliance |
| 12
| Form of Tender Security (Bid Security Guarantee) (Annex 1) | All Bidders | Eligibility & Contractual Compliance |
| 1313 | Historical Contract Non-Performance Acknowledge, stamp and sign (Form CON – 2) | All Bidders | Minimum Qualifications Requirements (MQR) |
| 14 | Environmental and Social (ES) Declaration Acknowledge, stamp and sign (Form CON – 3) | All Bidders | Eligibility & Contractual Compliance |
| 15 | Bank Certificate to confirm Financial Situation and Performance (Form FIN – 3.1) | All Bidders | Minimum Qualifications Requirements (MQR) |
| 16 | Average Annual Construction Turnover Acknowledge, stamp and sign with copies of financial statements within the last 5 years (Form FIN – 3.2) | All Bidders | Minimum Qualifications Requirements (MQR) |
| 17 | Specific Construction Experience with at LEAST 3 (additional contracts will grant points during Technical Evaluation) contracts within the last 5 years (Form EXP – 4.2 (a)) Acknowledge, stamp and sign | All Bidders | Minimum Qualifications Requirements (MQR) |
| 18 | Audited Financial Statements (including Balance Sheets, Income Statements, and Notes) for the last five (5) financial years | All Bidders | Eligibility & Contractual Compliance |
| 19 | WASH Sectoral Clearence from the National WASH Commission of Liberia | All Bidders | Eligibility & Contractual Compliance |
PAYMENT SCHEDULE
This PAYMENT Schedule defines the Contractor’s obligations to complete the Works in Milestones (Sections) and corresponding payment percentages for the Works.
| Milestone No. | Description of Works/Deliverable | Indicative Completion Date | Payment % | Remarks |
| 1 | Advance Payment: – After the signing of contract and the submission of a advance payment guarantee approved by CRS | April 2026 | 20% | |
| 2 | Foundation Work and Borehole Drilling: – Completion of Boreholes drilling – Completion of all foundation works – Completion of water tower ground floor structure works, includes 1st upper slab, beams and columns
| May 2026 | 25% | |
| 3 | 2nd & 3rd Floor Structural Work: – Completion of all structure works, columns, beams and slab for 2nd and 3rd floor. – Completion of all structural works for extended water kiosks – Installation of automatic chlorine dozers | July 2026 | 20% | |
| 4 | Plumbing Works: – Completion of all plumbing works for the main water systems and the kiosks – Installations of storage tanks – Completion of household connections, 50 houses. – Installation of submersible pump | August 2026 | 15% | |
| 5 | Finishing: – Completion of plastering – Installation of doors and windows – Installation of galvanized rail and ladder – Tiling – Painting – Finishing and rendering – Testing and commissioning | September 2026 | 20% | |
| 6 | 10% Retention will be deducted from all payment to be paid after the defect and liability period |
Contractor shall indicate with its bid any proposed changes to the form of contract.
Contract Form Flexibility
The contract form attached to this RFP is provided as a draft for reference. CRS may propose modifications during negotiations to reflect project requirements, applicable laws, or risk allocation. Respondents may also propose alternative language for consideration, provided such changes do not conflict with mandatory provisions of the RFP. Final terms will be subject to mutual agreement.
[1] Non performance, as decided by CRS, shall include all contracts where (a) non-performance was not challenged by the contractor, including through referral to the dispute resolution mechanism under the respective contract, and (b) contracts that were so challenged but fully settled against the contractor. Non performance must be based on all information on fully settled disputes or litigation, i.e. dispute or litigation that has been resolved in accordance with the dispute resolution mechanism under the respective contract and where all appeal instances available to the applicant have been exhausted.
2 CRS may use this information to seek further information or clarifications during the bidding stage and the associated due diligence.